Identity area
Type of entity
Authorized form of name
Parallel form(s) of name
Standardized form(s) of name according to other rules
Other form(s) of name
- Consolidated Mining and Smelting Company of Canada Ltd.
Identifiers for corporate bodies
Description area
Dates of existence
History
Consolidated Mining and Smelting Company of Canada Ltd. (C.M.S.) was formed in 1906 as a subsidiary of Canadian Pacific Rail with head operations in Trail, British Columbia. Its aggressive northern exploration in the 1920s and 1930s led to stakes claimed in 1927/28 on the lead and zinc deposits on the south shore of Great Slave Lake, which would later become Pine Point Mine, silver deposits at Great Bear Lake in the 1930s, and Con Mine, which was the first gold mine to go into production in the NWT in 1938. C.M.S. also developed other mines in the Northwest Territories including Thompson-Lundmark, Ruth, Ptarmigan, and Polaris. C.M.S. mines had a significant impact on the economic and social history of the Northwest Territories, particularly in the case of Con Mine and Pine Point.
Con Mine
C.M.S. sent several prospecting parties headed by Ted Nagle into the Yellowknife area in 1928/29, but their searches did not reveal anything significant. During a staking rush in 1935, Bill Jewitt sent a small group of men led by Mike Finland into the Kam Lake area of Yellowknife where they filed ‘CON’ claims in September and October. In 1937 C.M.S. bought an interest in Tom Payne’s adjacent properties, which developed into the Rycon Mine company. The construction of the Con-Rycon mines began on July 13, 1937 under the lead of Bob Armstrong. Production began in the spring of 1938 with the first gold brick poured on September 5, 1938. The Bluefish Hydro plant on Prosperous Lake was built in 1940 to support the energy needs of the mine, and also made Yellowknife the first electrified NWT community. Production at Con Mine ceased between 1943 and 1945 due to WWII although maintenance and development work continued under the direction of geologist Dr. Neil Campbell. The Campbell Shear Zone was named in honour of his hypothesis of a major orebody 2000 feet below the surface of the mine. Its existence was confirmed in 1946, with full production starting in 1963 and continuing until the closure of the mine. In 1953 C.M.S. bought the Negus Mine and found new reserves there. In 1966 C.M.S. changed its name to Cominco. The Robertson shaft – at 250 feet the tallest building in the NWT – was completed in 1977 and eventually reached a depth of 6250 feet. The Con Mine was the most productive gold mine in the NWT, and Cominco’s most successful gold mine.
In 1986 Cominco sold the Con Mine to Nerco Minerals for $46 million US. Con Mine was subsequently bought by Miramar Corporation for $25 million US in 1993. Miramar leased the mining rights of the Giant Mine in 1999 and milled Giant ore at the Con Mine. In 2003 mining ceased at Con, and the processing of Giant ore at Con ceased in 2004. Demolition and reclamation of the mine site occurred over several years, with the demolition of the iconic Robertson headframe - then the tallest structure in the NWT - happening on October 29, 2016.
Through its history, the Con Mine produced 5,276,363 ounces of gold from 12,195,585 tons of ore milled between 1938 and 2003. Over 10,000 gold bars were produced in 65 years of operation.
Pine Point
In 1928 C.M.S. began exploration in the Pine Point area south of Great Slave Lake, and in 1929 formed the Northern Lead Zinc Company with the Atlas Exploration Company and Ventures Ltd. Assessment work on the lead and zinc deposits in the area continued between 1930 to 1948, with extensive exploration drilling 1948 to 1955. Pine Point Mines Ltd. was formed in 1951 with C.M.S. holding a majority interest. In 1962 Pine Point Mines Ltd. began construction on the Great Slave Lake Railway with assistance from Canadian National Railway and the Canadian Federal government’s “Road to Resources” program. This railway line connected Roma Junction, Alberta and Pine Point, a company town that was established in 1964. Mining began in 1963, and mill production started in 1965. Mining ceased due to economics in 1987, and the town officially closed on September 1, 1987. 8.4 billion pounds of zinc and 2.6 billion pounds of lead were produced over the mine’s history. The railway and townsite have since been removed.